Schuran Kunststoffe & Seawater Equipment Project

Private Residence in Qatar

This aquarium was installed in a private residence in Qatar and has been up and running for a little over 2 years. The Schuran Team was in Qatar for a pre-installation inspection, to take measurements and perform a building site inspection. As well to finalize the exact aquarium, furniture and coral design with the client. Luckily they had their pre-visit, as the measurements of the aquarium and furniture had to be adjusted as the floor and ceiling height were different as expected.

 

After 3 month of manufacturing (aquarium, life support system and furniture) the aquarium was sent to Qatar by sea freight. After delivery , the Schuran team went back to Qatar for installation and set-up. It took them less than 1 week, including travelling days as this was very well planned and prearranged project.

 

​